Flagge Deutschland Flagge England

Plenty of room for ideas – design according to your wishes!

 

The Innovations Centre offers plenty of room to design according to your own individual ideas. You are free to choose from laboratories, offices or storerooms or combine them as you wish.

Vermietung April 2016

 

WATER AND waste water system

The Innovation Centre has central changing rooms and washroom facilities with toilets, wash and shower facilities. It also has handicapped accessible toilet and shower. Further there is a tea kitchen on the top floor.

The laboratories supply laboratory water and there is an eye wash facility and emergency showers as well as wash places with a connection for an instantaneous water heater to be borne by the tenant.

Heat supply system

The building will be heated using municipal heating of Stadtwerke Senftenberg.

Ventilation System

The laboratories will be served over a partial air conditioning system and supplied with the air flow functions:

• Filter class: air supply 7

• Heat recovery

• Cooling

• Air heating

The design of the laboratory ventilation system is safety standard S2 conform. The laboratories are equipped with a 25 m³/m²h air exchange system and are operated with a low under pressure. The feed air is transported via a variable air volume controller and so the room is (under) pressure controlled.

The laboratories are equipped with the following connections:

Air vents to enable the tenant to install a bench mounted fume cupboard. (Tenant’s responsibility)

• Exhaust air vents connection (tenant’s responsibility) to the safety cabinet (24h-exhaust air)

• All laboratories are equipped with a floor-level vacuum extraction.

All laboratories have a separate fan to extract the exhaust air which is mounted on the roof. Every fan has a motorized shut-off damper on the suction side. Using an operating mode switch the air-conditioning can be set individually between phases 0-1-2 from inside the laboratory.

Generously proportioned installation shafts and reserve roof space provide possibilities for additional installations (tenant’s responsibility).

POWER SYSTEMS

The laboratories and offices are equipped with their own sub-distribution board. The distribution units are equipped with all switchgear and protective devices. Simultaneously 20 percent reserve installation space has been kept free (tenant’s responsibility)

The laboratories and office area are also equipped three band fluorescent lamps with electronic ballast mounted lengthwise.

TELECOMMUNICATIONS and information systems

The building has a structured Cat 7 data processing network. The 19 inch data cabinets are in the lockable IT rooms on the ground floor and in the top storey. Office and the laboratory area devices can be interconnected to network structures together or individually via patch panels. There is a central connection to the public telecommunication network and the data cabinets.

Elevator

The building has a 1000 kg (nominal load) or 13 persons machine room-less passenger elevator suitable for disabled persons with access on the ground and top storey.